The company undertakes the engineering design and equipment manufacturing supply contract for the coal powder preparation system and the quicklime milling system of the 2×600t/d

Release date:2019-06-30 Views:285

On June 25, 2019, the company successfully signed the contract for the pulverized coal preparation system and quicklime grinding system of the 2 *600 t/d double-chamber lime kiln project in Coluvezi, Congo (DRC). The main content of the contract is the engineering design and equipment manufacture of a set of pulverized coal preparation system and a set of quicklime pulverizing system, and the system mainly includes a set of 12t/h (200 sets). A vertical coal pulverized coal preparation system with 90% mesh and a set of 3 t/h (90% mesh through 200 mesh) quicklime pulverizing system were developed.



On June 25, 2019, the company successfully signed the contract for the pulverized coal preparation system and quicklime grinding system of the 2 *600 t/d double-chamber lime kiln project in Coluvezi, Congo (DRC). The main content of the contract is the engineering design and equipment manufacture of a set of pulverized coal preparation system and a set of quicklime pulverizing system, and the system mainly includes a set of 12t/h (200 sets). A vertical coal pulverized coal preparation system with 90% mesh and a set of 3 t/h (90% mesh through 200 mesh) quicklime pulverizing system were developed.



×