Guangxi XXXX New Materials Co., Ltd. 2×600t/d Lime Kiln Pulverized Coal Preparation System
Release date:2025-04-27 Views:22
Project Information Summary Table
Project |
Guangxi XXXX New Materials Co., Ltd. 2×600t/d Lime Kiln Pulverized Coal Preparation System |
Location |
Guangxi, Laibin |
Signing Date |
June 3, 2023 |
Commissioning Date |
April 8, 2025 |
Supply Scope |
HVM1400M Pulverized Coal Preparation System Complete Equipment |
Material |
Mixed Coal of Bituminous and Anthracite |
Performance |
Output: ≥14t/h |
Product Fineness: 80% passing through 200 mesh |
|
Highlights |
This project is another pulverized coal preparation project undertaken by our company for processing mixed coal of bituminous and anthracite. Bituminous coal has high volatile content and moisture, while anthracite has poor grindability. The system requires strict drying capacity and safety, as well as high product fineness. It is essential to scientifically balance the relationship between drying, product fineness, and system safety to achieve optimized system operation. |
Project Information Summary Table
Project |
Guangxi XXXX New Materials Co., Ltd. 2×600t/d Lime Kiln Pulverized Coal Preparation System |
Location |
Guangxi, Laibin |
Signing Date |
June 3, 2023 |
Commissioning Date |
April 8, 2025 |
Supply Scope |
HVM1400M Pulverized Coal Preparation System Complete Equipment |
Material |
Mixed Coal of Bituminous and Anthracite |
Performance |
Output: ≥14t/h |
Product Fineness: 80% passing through 200 mesh |
|
Highlights |
This project is another pulverized coal preparation project undertaken by our company for processing mixed coal of bituminous and anthracite. Bituminous coal has high volatile content and moisture, while anthracite has poor grindability. The system requires strict drying capacity and safety, as well as high product fineness. It is essential to scientifically balance the relationship between drying, product fineness, and system safety to achieve optimized system operation. |